
Day 42 - HVAC was nearly finished today. The main trunk and all runs have been connected. They still need to finish out the cold air return, connect a section of the drier vent, and run the bathroom vent. I don't know why they left this original flexi running right through the storage room. That kind of sucks.
No comments:
Post a Comment